PAST PROJECTS

Some of Our Latest Work

IMG_3124.HEIC
driveway 2 .jpg
IMG_3551.HEIC
USA Flag

NEW DRIVEWAY CUT

September 2019

We cut a driveway for a homeowner so they had better access to their home. once cut we graded and laid recycled asphalt for a nice smooth drive.

DRIVEWAY & CONCRETE SLAB

July 2020

This project was a full re-construction of 500 feet of driveway with a concrete slab in front of garage.

LAND CLEAN UP

August 2020

We cut and leveled out this area for future use of the customers property. 

​

Bank of America

November 2022

Working for such a big corporation was a very cool experience for us. This was a project that allowed us to really spread our wings and show the commercial side of the industry what we are capable of. 

Types of Gasoline
Image by Remy Gieling
Image by Khadeeja Yasser
Car at Car Wash

Quick Trip Gas Station

November, 2022

Grizzly was not originally the selected contractor for this project but was contacted to come in and take over all the grading and finish the remainder of the excavations that were left. We were able to get the project back on schedule and finish with a beautiful product. 

MEAD BOX CULVERT

April 25, 2023

This was a time sensitive project. Grizzly Contracting had to expand a box culvert in an active water way for future CDOT expansions.

STARBUCKS, STERLING COLORADO

March 2023

This Starbucks project was done for KTK out of Westminster Colorado. Grizzly Contracting was contracted out to do all of the excavations, grades, and utilities.

CHAMPION XPRESS CAR WASH

October 2023

We have multiple car wash projects under our belt. This one in particular was interesting due to the fact that there were so many weather delays. But our guys were able to adapt and over come mother natures curve balls and keep the project on track.